McArthurGlen Designer Outlet Ashford
Physical model illustrating central bowl. Image courtesy of Rogers Stirk Harbour + Partners. |
RSH+P's McArthurGlen Designer Outlet Ashford opened in Ashford, Kent, UK in March 2000.
Project note: A £90 million expansion of the Ashford Outlet was completed in November 2019.
The proliferation of out-of-town retail developments on the American model is a contentious issue in Britain and in Europe generally. This retail development at Ashford reverses the trend, occupying a prime piece of brownfield land - a former railway and engineering site - adjacent to a major public transport hub, Ashford’s International Station, with connections to the Channel Tunnel and London.
In architectural terms too, the development is innovative, eschewing the monumental and inflexible character of many recent retail schemes. Instead the single storey retail units shelter beneath a 30,000 m² high-tensile fabric roof, one kilometre in length and supported on 24 bright orange steel masts. The centre can accommodate 3,000 visitors at any one time (there are parking spaces for 1,400 cars) and includes a food court, tourist information centre and exhibition space. The design allows for future flexibility - the retail outlets can be easily relocated and reconfigured as required.
The distinctive tent structure is festive in spirit, unites the centre and announces itself proudly within the 30-acre site. It is undulating in form, rising to high points whose vertical masts act as counterpoints to the horizontal nature of the development and local topology. It wraps around the edge of the leaf-shaped plan and joins the northern end of the site.
Servicing to the retail outlet centre is accessed by a road at the rear of the retail units, which is concealed from view by the three metre-high landscaped embankment. This embankment gently slopes up to the eaves-line of the retail units providing a compositional springboard for the tented structure. To the outsider, an impression of self-containment and privacy is given for what is, in reality, an ever-changing public space.
The centre is designed as a ring of accommodation, looking inwards to a car park for 1,400 cars. In order to minimise the visual impact of the building, the centre is designed to sit low in the landscape.
The embankment, acting as a springboard for the tensile structure and concealing the service ring road, reaches up almost as far as the eaves of the tented structure. Appearing as a tented encampment on the landscape, the impression from the exterior is one of self-containment and enclosure for what is, in effect, a vibrant and busy retail development.
The defining element of the design is the lightweight tensile fabric roof, supported from 22 bright orange steel masts and attached to the ground by tension cables attached to circular concrete pads anchors.
The tent is undulating in form, rising to high points where the vertical steel masts act as counterpoints to the predominantly horizontal composition. The tent wraps around the leaf-shaped plan, joining at the northern end of the site. Here, pedestrians and train passengers arrive, passing a tourist information centre, a public display area, management suites and a food court. Those travelling by car arrive from the southern end of site where they gain access to the landscaped car park at the centre of the development.
Image courtesy of Rogers Stirk Harbour + Partners. |
The roof, the longest continuous tent structure in the world and covering an area of 30 square kilometres, shelters the ring of single storey units below. The units themselves, glazed on the inner face and clad in solid blue panels to the rear, are highly flexible insulated ‘boxes’. Each unit is air-conditioned with bright yellow external air handling units located on the rear of the units.
The boxes can be rapidly reconfigured, allowing for changing retail demands and a large number of occupants with varying requirements. This flexibility is achieved through the removal and erection of lightweight partitions and the reconfiguration of shop fronts as required. The units are serviced from the rear, directly accessible from the service road, thereby minimising interruptions to the shop fronts and removing the need to disrupt the public spaces.
The roof is the longest continuous tent form in the world and required detailed study to establish how it was to be built in relation to other trades involved in the project, as well as ensuring its temporary structural stability for the duration of the construction programme.
The structural model for the roof was established by Buro Happold Engineers working in collaboration with Richard Rogers Partnership. Detailed discussions also influenced the type of cables specified and the nature of the connection details, as well as the specification for the tent-like roof material.
The specialist nature of the lightweight roof, a material similar to PVC, meant that the steel fabrication company became part of the team early in the design process. They were then responsible for the detailed design and fabrication for this significant part of the contract. During the construction, a team of highly trained riggers were employed as part of the tent erection team.
The site remediation strategy formed an important element of the construction programme and provided a significant challenge for the contractor in terms of soil grading, washing and batching prior to the construction of the continuous landscaped berm.
To avoid the cost and environmental impact of removing large quantities of material from the site, significant amounts of soil were re-used. Repetitive cladding details and modular design of the environmental systems also significantly reduced the overall cost of the project.
Ashford Designer Outlet is a shopping centre is a large oval surrounding a large car park. The building is formed from box shaped units with the white canopies forming a covered walkway. |
[edit] Project information:
- Place/Date: Ashford Designer Retail Outlet, Ashford, Kent, 1996 - 2000
- Client: BAA McArthurGlen UK Ltd.
- Total Project Cost: £21 million
- Total Area: 30,000 m² Site, 19,000 m² Gross Floor Area
- Architect: Rogers Stirk Harbour + Partners
- Structural Engineer: Buro Happold
- Services Engineer: John Brady Associates
- Quantity Surveyor: Davis Langdon & Everest
- Lighting Consultant: Lighting Design Partnership
- Planning Consultant: Montagu Evans
- Landscape Architect: Derek Lovejoy Partnership
- Civil Engineer: Buro Happold/Arup
- Contractor: Galliford Northern, Kajima/Laing Management Joint Venture
Click here to see the full job sheet.
[edit] About this article
This article has been provided by Rogers Stirk Harbour + Partners.
--RSHP
[edit] Related articles on Designing Buildings Wiki
- 3 World Trade Center.
- 8 Chifley.
- 88 Wood Street.
- Articles by RSHP on Designing Buildings Wiki.
- BBVA Bancomer headquarters.
- British Library extension.
- British Museum World Conservation and Exhibitions Centre.
- Centre Building at LSE.
- Centre Building at LSE shortlisted for RIBA award.
- Centre Pompidou.
- Heathrow Terminal 5.
- International Spy Museum.
- Macallan Distillery and Visitor Experience.
- Madrid Barajas Airport.
- One Park Taipei.
- Retail buildings.
- RSHP move to Leadenhall Building.
- RSHP reveal new studio.
- Skyfarm.
- Snowfall at the Berkeley.
- Taiwan Taoyuan International Airport Terminal 3.
- Thames Wharf Studios.
- Y Cube.
Featured articles and news
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.